In the lead-up to start-up of LLC North Kuzbass Oil’s process units, the repair of primary equipment has been successfully completed. A preliminaries plan has been realized, thus, enabling to run operation process reliably during the start-up.
Heat exchangers have been repaired on crude distillation units, pipelines inspected and instrumentation equipment checked. An inspection of the vacuum tower internals on the atmospheric residue deep conversion unit conducted.
Besides that, in the beginning of July, the work for extension of a light products filling rack has been completed, thus, allowing to reduce shipping time of the finished products.